Pages Menu
TwitterRssFacebook
Categories Menu

Posted on 2015 Apr 6

Enerdu Flashboards Reduce the Overall Power Output From the River

The MVFN has released a 2nd edition of the MVFM Appleton Wetlands report for MNR. The 2nd edition includes the Power Production analysis, showing that when Enerdu adds flashboards in Almonte (at the upper falls) the result is a net power loss to the province 75 MWHr avg.

The report additions and changes are available on our Resources Page here. The covering letter for this addendum from the MVFN is also there.

AppendixR-Reach_18_Power_Production_Fig_7

Post a Reply

Your email address will not be published. Required fields are marked *